Construction started in 2006 and was finished in 2007.
Surge Space Building
400 Stanger St.![Surge Space Building](/content/vt_edu/en/about/locations/buildings/surge_space_building/_jcr_content/content/adaptiveimage.transform/m-medium/image.jpg)
The building provides space to temporarily house academic or administrative units that are displaced because of renovations to their home buildings. The facility was designed using a pre-engineered steel frame with its exterior clad in metal panels and precast concrete-like panel accents. The building is designed to be disassembled and recycled in 10 or 15 years.
Building History
- Originally Built:
- 2007
- Map Grid:
- L-2
- Abbreviation / Number:
- SURGE / 170
- Coordinates:
- 37.23301, -80.423